SMA Sunny Tripower 125, 125 kW – PV inverter

The ideal PV inverter for larger commercial installations

Sunny Tripower 125 STP125-70

SMA ArcFixSMA Smart ConnectedSMA ShadeFix

SMA will no longer sell the Sunny Tripower 125.

All technical information on the operation of the Sunny Tripower 125 is still available under the Downloads tab on this page.

Sunny Tripower 125

FAQ

General information

Are surge arresters integrated in the Sunny Tripower 125?

Yes, the Sunny Tripower 125 is equipped with Type 1+2 surge arresters on the DC side and with Type 2 surge arresters on the AC side.


What is the noise level of the Sunny Tripower 125?

The maximum noise emission (level) is less than 71 dB(A) at a distance of 1 meter. The average noise level measured at a distance of 1 meter was 64 dB(A). When comparing with other products, please note which of the two values was referred to.


How long is the warranty for the Sunny Tripower 125?

The standard warranty for the Sunny Tripower 125 is 5 years.


Is it possible to extend the warranty for the Sunny Tripower 125?

Yes, you can extend the warranty to 10, 15 and 20 years, and it can be purchased from SMA via the Online Service Center (https://my.sma-service.com/s/osc-30-warranty-extension).


Compatibility

Is the Sunny Tripower 125 compatible with the Sunny Home Manager?

No, because the Sunny Tripower 125 is intended for commercial use, it is currently only fully compatible with the SMA Data Manager M or products that have an integrated System Manager.


Does the Sunny Tripower 125 have an integrated System Manager?

No, the Sunny Tripower 125 requires a superordinate communication device, such as the SMA Data Manager M, particularly to comply with the regulatory requirements.


Is the Sunny Tripower 125 equipped with a Webconnect interface?

Yes, for the simple systems without regulatory requirements, the inverter can be displayed directly in the Sunny Portal powered by ennexOS without the need for additional communication products.


Can the Sunny Tripower 125 be directly connected to a ripple control receiver?

Yes, the inverter has 4 digital inputs available for this purpose.


Can an external grid monitoring unit be connected in order to disconnect the inverter from the utility grid in case of a grid fault?

Yes, a fast stop input is used for this purpose. It can be connected to the trigger contact of an external grid monitoring device, which will lead to disconnection of the inverter from the utility grid within less than 100 ms in the event of a grid fault. These features can be used, for example, to implement the simplified grid and PV system protection required in Germany as part of VDE AR-N 4105. An additional interface switch can therefore be omitted.


Is it possible to connect an energy meter to the Sunny Tripower 125?

No, an energy meter can only be used if there is a superordinate communication device, such as the SMA Data Manager M, in the system.


What components are needed to implement a closed-loop control at the point of interconnection with one or more Sunny Tripower 125 inverters?

An SMA Data Manager M and a meter at the point of interconnection are required to implement a closed-loop control. The controller and the setpoint can then be configured in the SMA Data Manager M.


Sunny Tripower 125

TechTip

TechTip: Mounting and Installing Sunny Tripower 125

TechTip: Connection and activation of the grid and system protection on the Sunny Tripower 125

Sunny Tripower 125

Downloads

Operating manual

Operating manual

The operating manual is also available as

eManual
With Sunny Design, you can plan your tailor-made PV system in just a few clicks.

Sunny Design

With Sunny Design, you can plan your tailor-made PV system in just a few clicks.

Plan your system now
We will be happy to advise you on your PV projects.

Contact

We will be happy to advise you on your PV projects.

Contact us